Boeing Delivers 5th Production P-8A Poseidon to US Navy
07.11.2012 North America
On November 2, Boeing delivered the fifth production P-8A Poseidon aircraft to the U.S. Navy.
The P-8A is one of 24 low-rate initial production (LRIP) maritime patrol aircraft that Boeing is building for the Navy as part of contracts awarded in 2011 and 2012.
“This is our final P-8A delivery of the year; we’ll ramp up to 12 deliveries, including P-8I aircraft for India, in 2013. Our in-line production approach, which draws on processes developed on the company's commercial and military programs, has been key to our ability to increase production rates while reducing costs,” said Chuck Dabundo, Boeing Vice President and P-8 Program Manager.
“As we transition to the P-8A and prepare for Initial Operational Capability in 2013, the U.S. Navy is successfully flying the first production planes at Naval Air Station Jacksonville, Florida,” said Capt. Aaron Rondeau, U.S. Navy P-8A Integrated Product Team lead.
The next 3 Poseidon aircraft are undergoing mission systems installation and checkout in Seattle, and two more are in final assembly in Renton, Wash. Boeing will deliver its sixth production P-8A to the Navy in early 2013.
The Navy plans to purchase 117 of the Boeing 737-based P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its P-3 fleet.
As part of the LRIP contracts, Boeing is also providing aircrew and maintenance training for the Navy, in addition to logistics support, spares, support equipment and tools.
The P-8A is one of 24 low-rate initial production (LRIP) maritime patrol aircraft that Boeing is building for the Navy as part of contracts awarded in 2011 and 2012.
“This is our final P-8A delivery of the year; we’ll ramp up to 12 deliveries, including P-8I aircraft for India, in 2013. Our in-line production approach, which draws on processes developed on the company's commercial and military programs, has been key to our ability to increase production rates while reducing costs,” said Chuck Dabundo, Boeing Vice President and P-8 Program Manager.
“As we transition to the P-8A and prepare for Initial Operational Capability in 2013, the U.S. Navy is successfully flying the first production planes at Naval Air Station Jacksonville, Florida,” said Capt. Aaron Rondeau, U.S. Navy P-8A Integrated Product Team lead.
The next 3 Poseidon aircraft are undergoing mission systems installation and checkout in Seattle, and two more are in final assembly in Renton, Wash. Boeing will deliver its sixth production P-8A to the Navy in early 2013.
The Navy plans to purchase 117 of the Boeing 737-based P-8A anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft to replace its P-3 fleet.
As part of the LRIP contracts, Boeing is also providing aircrew and maintenance training for the Navy, in addition to logistics support, spares, support equipment and tools.
Latest news
Latest events
Doha International Maritime Defence Exhibition & Conference (DIMDEX 2026)
19 - 22 Jan 2026Doha - QatarUMEX – SimTEX
20 - 22 Jan 2026ADNEC Centre Abu Dhabi, - United Arab EmiratesWorld Defense Show (WDS) 2026
08 - 12 Feb 2026Riyadh - Saudi ArabiaSAHA EXPO International Defence & Aerospace Exhibition
05 - 09 May 2026İstanbul Expo Center - Turkey







